GMW 8287 PDF

0

Find the most up-to-date version of GMW-R – GMW at Engineering GMW GMW GMW Additional References. EIA/JEDEC JESDAB. © Copyright General Motors Corporation All Rights. It is suggested to be at least 10 minutes in both IPC A and GMW For screening purposes (HASS, ESS), also depend on the stress limits being.

Author: Tygozahn Zolozragore
Country: Dominica
Language: English (Spanish)
Genre: Love
Published (Last): 6 May 2018
Pages: 142
PDF File Size: 4.27 Mb
ePub File Size: 8.40 Mb
ISBN: 466-2-98281-519-8
Downloads: 34765
Price: Free* [*Free Regsitration Required]
Uploader: Dairisar

For Design Improvement Purpose. Procedures are explained in detail; however, the basic nature of the HALT process is one of discovery that requires flexibility of process as it progresses.

Note that the functional test should be performed throughout the step, however it must minimally be performed 88287 the conclusion of the ten-minute dwell.

An example of this type of product is available from the ” company” Each of the major parameters; upper thermal operating limit, lower thermal operating limit, and vibration limit should be quantified for each of the three samples.

Random Vibration (RS) | Center for Advanced Life Cycle Engineering

If a destruct limit was not determined during Vibration Step Stress, then the maximum vibration level attained is divided by five. This small group parts should never be sold. Parameters Determination Step Size Based upon the accuracy required for failure point definition and the time available for testing. Make, model and serial number of all test equipment used? These individuals need not be present during the entire HALT, but must be available on an as needed basis.

The use of the accelerometer on the product is critical in HALT to assess the level of energy that is being conveyed into the product via fixturing method from the table input. Dwell periods in temperature steps should be long enough to allow critical components to reach set-point temperature This thermocouple should not be placed on or near a heat-generating component, or inside a totally closed portion of a product.

  HELMUT KIPPHAN HANDBOOK OF PRINT MEDIA PDF

HALT with corrective action to make the product robust? Vibration desired on the circuit board is 16 Grms per our continuing example.

Description of the product fixturing used during testing, and photographs should be included to support the description? Increased sample-to-sample variation will decrease the gwm of the screen. This HALT process is performed following the corrective action process when a product is redesigned. Performance of the test samples to the HALT stresses, detail the occurrences of sample degradation and the conditions at which they occurred, including the operating 82877 destruct limits of the sample and any other important comments?

For screening purposes HASS, ESSalso depend on the stress limits being decided, remaining life of the good population should be taken into account when deciding dwell time.

The thermal transitions are performed at the maximum attainable rate of change. Poor Solderabiltiy of Leads.

Durability Growth through HALT/HASS and Accelerated Testing

A ggmw action plan is incorporated following adequate understanding of the failure mode. Pareto charts provide a relative hierarchical index of which problems should receive the most attention. The screen will thus use a smaller percentage of the operating limit greater safety margin due to this cumulative fatigue phenomenon.

Complete functional testing immediately follows the dwell period and may also be performed throughout the step. All data is shared with the Customer.

The root cause analysis process must be fully documented relative to: The gma format and style should be used as the standard HALT report. For screening purposes HASS, ESSalso depend on the stress limits being decided, remaining life of the good population should be taken into account when deciding dwell time Target stress level in this case, Maximum acceleration level Should be determined based on the purpose of defect precipitation.

  177 MANEIRAS ENLOUQUECER PDF

When improvement is statistically significant see quality control text booka new average yield line is drawn as well as new control limits.

The relationship relative to this topic should be based on a gms to operate as a partnership of learning organizations, share data in a climate devoid of fear, 827 to problems with an understanding of the failure mechanisms involved and moderated by an understanding of the concepts of “signals in a noisy environment”.

Records shall be maintained on the decisions 4. Detection of gjw solder joints is noticeably improved by this technique. HALT is considered to be the physical test, the root cause analysis, and the corrective action. GMW physics of some products may justify skipping this step as the rapid temperature transitions will occur during the combined thermal-vibration portion of the HALT process.

The nitrogen should reside outside the building and is connected via the shortest possible distance to the HALT chamber within the building.

Note that smaller starting vibration levels and increment levels may be used. Each product that is destined for the HALT process will dictate its own unique set of test values and stress steps.

The dwell time should be increased to allow higher mass components to reach at least 80 percent of the thermal range. We think you have liked this presentation.

These charts will guide the actions and reactions and provide a sound foundation for decision-making based on the data being taken. Constant monitoring should provide functional coverage that is as complete as possible.